Why do hospitals install protective handrails?
Background
information
In order to meet the increasing demand for medical services from patients, the hospital has increased investment, strengthened infrastructure, optimized the medical environment, improved the level of medical services, and created a beautiful and humanized ward environment, which organically integrates the functions of the hospital and the environmental characteristics, and creates for the patients A safe and comfortable environment for diagnosis and treatment.
Corridor handrails are necessary safety protection facilities in hospitals. Hospital corridors need to be equipped with professional anti-collision handrails, which are required to be hygienic, safe and tidy, which are convenient for patients to hold and walk, and can fully protect the wall, integrating beauty and practicality. . Provide timely and effective protection and convenience for hospital patients and staff.
How to choose how to protect handrails
Design standards
(1) Panel material:
Extruded panels made of high-density lead-free polyvinyl chloride (LEAD-FREE PVC) polymer.
(2) Anti-collision performance:
The material of all anti-collision panels must be tested according to ASTM-F476-76. The weight is 99.2 pounds). After the test, the surface material
There must be no chipping changes, and the test report must be attached for inspection before construction can be carried out.
(3) Flammability:
The anti-collision panel must pass the CNS 6485 flame resistance test, and it can be naturally extinguished within 5 seconds after the fire source is removed.
Submit the test report for inspection before construction.
(4) Wear resistance:
The anti-collision panel material needs to be tested according to ASTM D4060 standard, and it shall not exceed 0.25g after the test.
(5) Stain resistance:
The anti-collision panel material can be wiped clean with water to clean the common weak acid or weak alkali pollution.
(6) Antibacterial:
The anti-collision panel material needs to be tested according to ASTM G21 standard, and there is no mold on the surface after 28 days of cultivation at 28°C
Growth phenomenon to achieve aseptic space. The test report must be attached for inspection before construction can be carried out.
(7) The accessories must be the entire set of products supplied by the original manufacturer, and other accessories must not be used for mixed assembly to prevent collisions.
The armrest fixing bracket accessories must be detachable fixed locks to facilitate future repairs, maintenance and cleaning.
(1) Barrier-free handrails include barrier-free equipment in bathroom and living, including bathroom handrails and toilets
For products such as armrests, bathing chairs, etc., a corresponding space must first be reserved in the room.
(2) When installing barrier-free facilities in toilets, first find a suitable location. Generally speaking, there is no
If you have a bathtub, you can install a safety rail next to the shower head. The floor or wall in the bath
It is very slippery. Installing a handrail in the bathroom can effectively protect the safety of your family.
(3) Reserve appropriate space beside the urinal, toilet, and wash basin, and install upturning armrests, toilet armrests, and toilets.
Barrier-free products such as bucket handrails are convenient for squatting and grasping, providing safety guarantee.
(4) The product has passed the national building material inspection report, and it is resistant to Staphylococcus aureus and Escherichia coli.
Because professional so rest assured
Variety of products to meet your different design needs
HS-618 Hot selling 140mm pvc
medical Hospital handrail
HS-618 Hot selling 140mm pvc
medical Hospital handrail
HS-618 Hot selling 140mm pvc
medical Hospital handrail
HS-618 Hot selling 140mm pvc
medical Hospital handrail
HS-618 Hot selling 140mm pvc
medical Hospital handrail
HS-618 Hot selling 140mm pvc
medical Hospital handrail
1. The construction party should carefully check the wall conditions of the construction site before on-site construction to ensure
Proof that the wall is clean, and if there is any obstruction to normal construction, it should be properly dealt with first to ensure
It proves the construction safety and the best construction effect.
2. The construction party shall construct according to the construction manual, construction plan and construction drawing.
3. The surface flatness of the handrail is required to be consistent, and the handrail is required to form a straight line
No height difference.